  1. 1 Calculate
  2. 2 Understand
  3. 3 Compare
  4. 4 Decide

Build your concrete project

Add each slab, footing pad or known-area section. Every section keeps its own thickness.

Used for currency, terminology and default units.

Measurement system

Switching systems converts all physical values.

Project sections
Section 1

Quantity input only; this tool does not design thickness.

%

Adds only the selected extra volume after the calculated project volume.

Material options
Planning mode
Optional
$/yd³

Enter a supplier quote; no market price is assumed.

Presets are product-specific published yields, not universal bag-size assumptions.

Volume produced by one bag. Bag mass alone is never used.

Optional
$/bag
Thickness scenariosCompare 4 uniform depths
Compare uniform thickness scenarios

Each option is applied to the same combined project area, allowance, yield and prices.

Concrete required

Planning estimate

3.889yd³

Includes your selected planning allowance. Confirm ordering and rounding with your supplier.

Project totals

Calculated project volume
3.704 yd³
Planning allowance volume
0.185 yd³
Metric equivalent
2.973 m³
Exact bag equivalents
175
Whole bags to purchase
175
Verify before purchasing

Confirm dimensions, product yield, mix requirements, supplier rounding and delivery constraints. This is a quantity estimate, not structural design.

Section breakdown

Section breakdown
OptionShapeAreaBase volume
Main slabRectangle300 ft²3.704 yd³

Ready-mix and bag comparison

Ready-mix and bag comparison
OptionOrder quantityCalculation basisMaterial-only cost
Ready-mix3.889 yd³Price per yd³Not entered
Bagged concrete175 exact / 175 whole bagsQUIKRETE Concrete Mix — 80 lb; yield per bagNot entered

Thickness scenario comparison

Thickness scenario comparison
OptionWith allowance (yd³)Whole bags
3 in2.917132
4 in3.889175
5 in4.861219
6 in5.833263
Deterministic comparison

Increasing thickness from 3.00 to 6.00 in increases concrete quantity by 100.0%.

How it works

Normalize each simple section geometry to cubic metres, sum base volume, add only the selected planning allowance, then calculate ready-mix cost and bag equivalents from user-controlled price and yield.

Formula
V = area × thickness

Rectangles use L × W; circles use π × (D ÷ 2)². Volumes are normalized, summed, then the selected allowance is applied.

  1. 1

    Normalize each section

    Convert rectangle, circle, or known-area dimensions and thickness to SI units.

  2. 2

    Sum project volume

    Add every independently calculated section volume.

  3. 3

    Apply planning allowance

    Add only the extra percentage selected by the user.

  4. 4

    Calculate material options

    Use entered ready-mix price and actual product yield per bag when provided.

  5. 5

    Compare scenarios

    Apply each selected uniform thickness to the same combined section area.

Method reviewed August 2026

All formulas

V = L × W × T
rectangular volume using the documented inputs.
V = π × (D ÷ 2)² × T
circular volume using the documented inputs.
V = A × T
volume using the documented inputs.
O = V × (1 + p ÷ 100)
estimated order volume using the documented inputs.
B = O ÷ Y
exact bag equivalents using the documented inputs.
P = ceil(B)
whole bags to purchase using the documented inputs.
Cᵣ = O × r
ready-mix material cost using the documented inputs.
Cᵦ = P × b
bagged material cost using the documented inputs.

Estimate assumptions

Planning allowance
User selected Extra volume added after calculated project volume.
Bag calculation
Volume yield per bag Bag mass alone is never used to calculate quantity.
Pricing
User supplied No delivery, tax, labor, or current market price is assumed.

20 ft × 15 ft slab

At 4 in thickness, base volume is 100 ft³ (3.704 yd³). A 5% allowance produces 105 ft³, or 3.889 yd³. At 0.60 ft³ yield per bag, that is 175 exact equivalents and 175 whole bags.

Concrete checklist

  • Recheck each dimension and thickness.
  • Confirm mix/strength and actual product yield.
  • Ask about minimum orders, short-load charges, delivery access and supplier rounding.
  • Account separately for tax, delivery, labor, pumping and reinforcement.

Quantity planning, not concrete design

This tool does not choose thickness, strength, reinforcement, joints, subgrade, curing method or code compliance. Seek qualified project advice where required.

Concrete calculator FAQ

Why use yield rather than bag weight?

Yield is the fresh-concrete volume produced; package mass alone does not define that volume.

Does cost include delivery or labor?

No. Comparisons use only the prices you enter for ready-mix material and bags.

Why round bags up?

You purchase whole bags, so the exact equivalent is rounded upward with the ceiling function.

Can sections have different thicknesses?

Yes. Each project section has its own thickness; scenarios intentionally apply one uniform thickness for comparison.

Methodology and product-yield sources

  • Concrete Craftsman Series: Slabs-on-Ground — American Concrete InstituteReviewed August 2026

    Supports dimensional volume calculation and supplier ordering considerations.

  • What is yield? — American Concrete InstituteReviewed August 2026

    Defines concrete yield as produced fresh-concrete volume.

  • QUIKRETE Concrete Mix Technical Data — QUIKRETE · 2025Reviewed August 2026

    Supports approximate yields of 0.30, 0.45, and 0.60 ft³ for 40, 60, and 80 lb QUIKRETE Concrete Mix bags.